
Kitchen renovation
The Outcome
We have the old kitchen removed, installed all new plumbing and wiring.
Under the window we made an insulated wall in front of the brick wall, with the plumbing in it.
Under the existing ceiling we mounted an insulated lowered ceiling with the new wiring for the spots.
There is a new design radiator installed and the drain in the corner we covered it with a nice paneling.
For the client we laid down laminate floor tiles, and covered the wall AND ceiling with a bamboo finishing!
And as last ofcourse installed the kitchen with custom made counter top with tiling above it.









